Configure a plan
- Select the spacecraft, an available chemical or electric thruster, and Inclination Change in Overview.
- Choose the initial orbit and mass source using the existing Initial State step.
- Set the earliest start and Completion deadline (UTC). The optimizer must complete within this interval; it cannot place a burn before the start.
- Enter the Target mean inclination (GCRF) and its tolerance. Mean inclination removes the periodic variation present in instantaneous orbital elements.
- Set the propellant cap, required reserve, maximum duty fraction, minimum coast between burns, sunlight restriction and any UTC blackout intervals.
- Review the configuration and create the plan. Computation produces a proposal for the existing review/approval workflow.